Three Sections in Division 07 – Thermal and Moisture Protection, to incorporate sustainable construction requirements, such as low carbon, water, materials, plastics, and construction waste disposal.Seven Sections in Division 04 – Masonry, to integrate Canadian Heritage conservation work practices.07 81 23 – Intumescent Fire Protection, for preparation and application procedures of thin film spray-on intumescent fire-resistant materials.01 57 00 – Temporary Controls, specifying the installation of temporary erosion and sediment control measures’ installation during Work execution to prevent soil, groundwater and waterway pollution.01 35 13.93 – Special Project Procedures During COVID-19 Pandemic, to reduce the risk of exposure during construction.The following summarizes the latest set of updates. To maintain the Canadian National Master Specification's (NMS) relevance, the National Research Council of Canada (NRC) publishes a series of updates on a quarterly basis.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |